That’s where I am now. After spending something over 2 months in Kidlington, I’ve now moved upwards and away out of the Oxford areas toward Banbury.
Kidlington
Served it’s purpose.
The main reason for staying there was to do some much needed work on the boat.
Pump out toilet
Back in November 2025, I discovered some large holes in the pump-out holding tank. A steel tank which holds around 150litres of toilet waste.
The first tell-tale sign was the smell. I took up the carpets to try and find the source. Instead I got a surprise!
I did some work to shore up the immediate problems of smell and leakage and put the job on the back-burner.
As it came to the end of the summer and my work at Bullingdon prison drew to a close, my thoughts and efforts shifted to making good of this stinking device.
Not a simple job
Removing holding tank: At 80kg empty and the shape of a steel coffin, it wasn’t a simple or straightforward task to remove.


Selecting, sourcing, buying and fitting the new Thetford c402. The toilet area looks much better. Smells, of nothing, and does the job it should do.
The C402 is a cassette toilet which means I’m not reliant on moving the boat to deal with that side of things.
Getting it fitted right first time took over 1 month from the removal of the tank to the wiring and plumbing and replacement of panels and ‘making good’ with the toilet in its final location.
Lots of trips to Screwfix to get bits. Lots of measuring. Shuffling things around. Having to wait for things to dry, get flooded, then dry again.
All good fun!
Continue reading “Oxford canal @ Twyford Wharf”